Delivered with contracted partners in development and hardware
DL Invest Group
VVDN Technologies
Where are you starting from?
Most of our clients arrive with one piece of a data centre: the money, the workload or the need for a building and the machines inside it. We supply the rest.
Turn land, power or capital into an operating data centre.
We test the idea before you commit to it, then carry it through: site and power, financial model, capital structure, build, equipment and the first tenants. Our partners are contracted in, not handed over to you.
Usually starts with a Feasibility sprint or Investor advisory.
Site screening on grid capacity, tariff, permitting path and land
A financial model with capex, opex, PUE and energy-cost sensitivities
Capital structuring and access to investors in the GCC, London and Warsaw
Technical and commercial diligence on assets you plan to buy
Find capacity with priced power, in the right place.
We place workloads where the power cost is predictable, the latency suits your users and the data stays in the EU. If the hall you need doesn't exist yet, we can help you pre-lease it before it is built.
Usually starts with a requirements call: your workload, power draw, location and timing.
GPU capacity for training and inference under EU data residency
Edge-positioned capacity for latency-critical gaming workloads
Delivery and transcode capacity on long contract terms
Pre-lease options on sites still in development
Servers built to your specification if you run your own stack
Buy the hall or the hardware from one counterparty.
Servers, networking and storage are manufactured to specification by our hardware partner. Land, shell and construction come through our development partner. We manage the specification, integration and delivery schedule between them.
Usually starts with a Development mandate or a specification call.
AI and HPC servers, designed, assembled and reliability-tested
Cloud and enterprise infrastructure hardware
Networking, storage and full integration
Turnkey or build-to-suit facilities
Renewable generation with storage alongside the grid connection
Capacity is being built faster than it can be organised.
200MWPlanned capacity of the Bielsko-Biała hyperscale campus alone
12Data centres planned across Europe under a single Polish joint venture
2.8bn PLNMicrosoft commitment to cloud and AI infrastructure in Poland by mid-2026
2035Horizon of Poland's national Digitalisation Strategy, including AI factories
What actually decides whether a project gets built
Power, not capital
Grid connection, energy cost and permitting decide viability long before financing does.
Supply chain
Racks, servers and networking gear carry lead times that can outrun the shell they are meant to fill.
Demand
Halls get built before tenants are secured. Anchor demand is sourced late, and priced badly.
Figures as publicly reported. Sources are linked in the home market section below.
Ideas into operation.
Same principles. Bigger possibilities.
Energy infrastructure for a more connected economy.
/ 2026
Infrastructure for what's next.
Prime Power Partners
How can we help?
Enter at any stage. Most clients come in at 01 or 02, the two points where a project is most often mispriced.
01 Entry point
Feasibility and modelling
Financial model, capex and opex, PUE and energy-cost sensitivities, capital structure.
02 Entry point
Site and power
Location screening on grid capacity, tariff, permitting path, land and cooling.
03
Build and equip
Shell delivery, fit-out, racks, compute, networking and integration.
04
Anchor demand
First tenants sourced from our network in AI, gaming and streaming.
05
Monetisation and scale
Pricing, channel partners, follow-on sites, exit or refinancing.
Our partners
Strategic partners cover the parts of a project that usually stall it: the building and the hardware.
Development
DL Invest Group
European real estate and digital infrastructure platform, building since 2004 and now focused on hyperscale AI data centres in Central and Eastern Europe. Its joint venture with cloud provider Boosteroid covers up to 12 data centres across Europe, and in May 2026 the partners signed a 300 MW AI infrastructure agreement worth about $2.5bn with Argentum AI as operator, one of the largest independent AI compute deployments in Europe. Land and power, development, construction and long-term asset management all sit in-house.
What it gives youLand, shell and construction capability inside one counterparty.
Hardware
VVDN Technologies
Global product engineering and electronics manufacturer with around 12,000 people, 11 R&D centres and 9 manufacturing plants. Its data centre server practice runs from design to full assembly, and it is a member of the NVIDIA Partner Network.
What it gives youHardware at manufacturer economics, with specification control and a direct line to the factory.
Partner relationships are contractual and non-exclusive unless stated. Client mandates are structured independently of partner commercial terms. Partner logos are trademarks of their respective owners.
Poland
The data centre thesis is already playing out in our home market.
DL Invest and Boosteroid, Bielsko-Biała
Hyperscale AI and neocloud campus on revitalised post-industrial land in southern Poland, the first of twelve sites the joint venture plans across Europe. In May 2026 the partners signed a 300 MW AI data centre agreement with Argentum AI worth about $2.5bn, up from the 50 MW first reported, with construction under way.
Our development partner, anchored by a cloud gaming tenant. The pattern we take to other sites.
Poland's pipeline
Switch Datacenters WAW1 near Warsaw plans 100+ MW of IT load, with 60 MW in phase one. Atman's WAW-3 campus in Duchnice reaches 43 MW at full build-out. Data4 is growing its Jawczyce campus to up to 60 MW, with about €600m invested in Poland by 2030. Microsoft has committed PLN 2.8bn (about $700m) to cloud and AI infrastructure in Poland by mid-2026.
A market deep enough to sustain specialists, and young enough to still lack them.
National policy
Poland hosts two EU-backed AI Factories: PIAST AI in Poznań, and the €70m Gaia AI Factory in Kraków, co-funded equally by Poland and the EU through EuroHPC.
Public capacity creates private demand for adjacent commercial infrastructure.
Figures as publicly reported by the linked sources and not independently verified.
Two build markets. Two capital markets.
Connecting power to opportunity.
Poland / CEE India GCC London
Poland and CEESite, power, tenantsLondonCapitalGCCCapitalIndiaHardware
Poland and CEE Build
Power-advantaged post-industrial land, a deep engineering base, EU data residency and a demand cluster in gaming, streaming and AI.
India Build
Manufacturing depth through our hardware partner, and one of the fastest-growing compute demand curves in the world.
GCC Capital
Sponsor and sovereign capital seeking European digital infrastructure, and domestic projects seeking operating expertise.
London Capital
Institutional debt and equity, infrastructure funds, and the structuring market for cross-border deals.
We can take Gulf or London capital into a Polish site, equip it from India, and fill it from a network we already have.
Executive team
Our expertise: data centre delivery, transaction execution, AI products and access to capital in the Gulf, London and Poland.
Jakub Tadych
Partner, Investment origination and M&A
15+
years in cross-border investment
$15B+
investment pipeline originated
$20B+
M&A and strategic transactions advised
Structures and executes infrastructure, energy and technology investments across the Middle East, Africa, Europe and Asia, working between institutional capital, governments, global corporates and technology partners. Works directly in India, including strategic cooperation with VVDN Technologies on AI compute, modular data centres and OEM-led technology solutions.
Partner, Strategy, capital markets and partnerships
15+
years in executive leadership
$247M
divestment worked on
6
markets: Poland, UK, GCC, India, EU, US
Executive, entrepreneur and strategic advisor across technology, R&D, investment and listed-company environments, with P&L, M&A and capital-markets exposure on the Warsaw Stock Exchange. Co-founded an alternative investment company in gaming and technology, and took part in analysis and transaction work on the Embracer Group restructuring and the $247M divestment of selected Saber Interactive assets. Helped build the cooperation around DL Invest and Boosteroid in cloud streaming and infrastructure.
Focus
Strategy and transformation
M&A and capital markets
Strategic partnerships
Poland and CEE
Tom Kopera
Partner, Technology and venture building
20+
years building technology companies
40+
countries where his platform sold
Oxford
Blockchain Strategy Programme
Technology entrepreneur and venture builder across software, digital products, gaming, media and blockchain. Founded and scaled his own software company and a proprietary platform sold in more than 40 countries, and built Next Block Expo, one of the largest blockchain conferences in Central and Eastern Europe. Through ADW Labs he builds AI-native products using agentic development workflows.